最高でCTAL-TAE最新の2023問題集は100%試験合格率保証付きます [Q20-Q42]

Rate this post

最高でCTAL-TAE最新の2023問題集は100%試験合格率保証付きます

ベストな方法はISQI CTAL-TAE練習試験問題集

質問 20
Which of the following statement about the implementation of automated regression testing is FALSE?

 
 
 
 

質問 21
You are executing the first test run of a test automation suite of 200 tests. All the relevant information related to the state of the SUT and to the automated test execution is stored in a small database. During the Automated test run you observe that the first 10 test pass, while an abnormal termination occurs when executing the
11thtest. This test does not complete its execution and the overall execution of the suite is aborted. An immediate analysis of the abnormal termination is expected to be time consuming and you have been asked to produce a detailed report of the execution results for the first test run, as soon as possible.
What is the MOST important FIRST step to be taken immediately after the abnormal occurred when executing the 11thtest?

 
 
 
 

質問 22
A SUT has an existing automated test suite.
Which of the following statements relating to the introduction of new features in the SUT is TRUE?

 
 
 
 

質問 23
A web application was released into production one year ago, it has regular release which follow a V-model lifecycle and testing is well-established and fully integration into the development lifecycle. You have beenasked to implement a TAS for the regression test suite. The regression tests have been developed via the GUI and are expected to be run at least four times a month, for each planned release, for the whole operation solution life of the system (six years). Each screen of the GUI uses several third-party controls which are not compatible with the existing automation solutions. The environment for the automation will be stable, fully controllable and separated from other environments (development, staging, production).
What could be the MOST problematic for this TAS?

 
 
 
 

質問 24
Which of the following metrics could suggest, under certain condition that an automated regression test suite has NOT been updated for new functionalities added to the SUT?

 
 
 
 

質問 25
Which of the following is NOT an advantage of test automation?

 
 
 
 

質問 26
What is NOT a factor in considering when you are asked to ensure an effective transition from manual to automated tests?

 
 
 
 

質問 27
Which of the following is NOT a technical design consideration for a TAA?

 
 
 
 

質問 28
A SUT has an existing automated test suite.
Which of the following statements relating to the introduction of new features in the SUT is TRUE?

 
 
 
 

質問 29
Consider a SUT that small run on multiple platform during the execution of automated test runs. In each test run an automated test suite needs to be executed, with the same version of the TAF, against the same version of the SUT of each platform. Each platform shall have its own dedicated test environment. Your goal is to implement a process as automated as possible ( i.e with minimal manual intervention) that allows implementing a consistent setup of the TAS across the multiple test environments.
Which two of the following aspects are MOST relevant for achieving your goal in this scenario?
* The configuration of the TAS uses automated installation scripts
* The TAF saves the logs needed to debug errors in XML format
C)Features of the TAF not used by the automated tests have been tested
D)All the automated test cases contain the expected results
E)The TAS components are under configuration management

 
 
 
 

質問 30
Which of the following attributes should NOT be included in a test execution report associated with a suite of automated tests?

 
 
 
 

質問 31
You are reviewing the testability of your SUT.
Which of the following BEST refers to the characteristic of OBSERVABILITY?

 
 
 
 

質問 32
You have been asked to determine a TAS for a new release of a SUT,test should be automated wherever. The new release will consist of 5 new interfaces and an amendment to 3 existing interfaces. The new and amended interface will be deliver incrementally in 3 sprints, each lasting 2 weeks.
What would be the BEST Test Automation Solution (TAS) design in this scenario?

 
 
 
 

質問 33
The GUI of a Customer Relationship Management (CRM) application has been delivered through internet Explorer with proprietary Active X and Java controls. This implementation enables rich client capabilities, but specific commercial automation tools are necessary to automate test cases at GUI of functional test cases. This is to demonstrate whether a small set of the commercial are able to properly recognize actions taken by a tester when interacting with GUI of the CRM application.
Which of the following scripting techniques would be MOST suitable in this scenario?

 
 
 
 

質問 34
Which of the following statement about the implementation of automated regression testing is FALSE?

 
 
 
 

質問 35
A project consists of distributed teams working in a 24-hour environment, where activities happen at all hours of the day. This project adopts a CI (Continuous Integration) process when developer check-in code and consists of automated activities that include generating a build and deploying it to a test environment.
Automated integration tests are run multiple times a day. The project have asked for a report containing the automation test results for every build, which must be available 24/7 to the project team.
Which of the following would be the BEST way to automatically provides this report?

 
 
 
 

質問 36
Which of the following BEST describes why it is important to separate test definition from test execution in a TAA?

 
 
 
 

質問 37
You are working on a TAS for standalone application. The automated tests are developed based on a automation framework that allows interaction with GUI elements using on object orientated API. The GUI elements include menus, buttons, radio buttons, text toolbars and their properties.
Whilst automating a test, you have discovered that the GUI elements of some third party components are not identifiable by the automated tool you are using.
Which of the following is the FIRST stepthat you take to investigate this issue?

 
 
 
 

質問 38
You identified a suitable project to pilot an automation tool and planned and conduced a pilot. The pilot has been successful and tool Is being deployed within your organization, with a plan to increase tool use by the one project at a time. During this rollout some test processes will be changed slightly to gain additional benefits from using the tool.
In the pilot project, a small set of manual tests were automated for the first time. You are currently monitoring the test automation efficiency and this reveals that the automationregimefor the tests is not yet mature.
Which of the following statements is TRUE?

 
 
 
 

質問 39
Assume that you are the TAE responsible for the correct functioning of a TAS, deployed in a test environment that consists of a few machines running the same version of the operating system. The TAS has been working and stable since its deployment, it has been used to run an automated test suite consisting of many similar automated test. The infrastructure team is planning to update the operating system on these machines by installing a new the service pack for security reasons. Since the vendor of the operating system assurance full backward compatibility, the infrastructure team assurance that there will be no impacts on the functioning of the TAS.
What is the BEST approach to confirm the correct functioning of the TAS in this scenario?

 
 
 
 

質問 40
A defect in a SUT has been resolved and validated by an automated defect re-test in the current release of the software. This retest has now been added to the automated regression test suite.
Which statement BEST describes a reason why this defect could re-occur in future releases?

 
 
 
 

質問 41
Designing the System Under Test (SUT) for testability is important for a good test automation approach and can also benefit manual test execution.
Which of the following is NOT a consideration when designing for testability?

 
 
 
 

質問 42
You are currently designing the TAA of a TAS. You have been asked to adopt an approach for automatically generating and executing test cases from a model that defines the SUT. The SUT is a state-based and event-driven that is described by a finite-state machine and exposes its functionality via an API. The behavior of the SUT depends on hardware and communication links that can be unreliable.
Which of the following aspects is MOST important when designing the TAA in this scenario?

 
 
 
 

ISQI CTAL-TAE 認定試験の出題範囲:

トピック 出題範囲
トピック 1
  • Developing, capturing, or deriving test data
  • Providing access to test libraries as needed
トピック 2
  • Understand “design for testability” and “design for test automation” methodsapplicable to the SUT
  • Analyze a system under test to determine theappropriateautomation solution
トピック 3
  • Analyze the SUT responses during test executionto steer subsequent test runs
  • Understanddesign considerations for a TAA
トピック 4
  • Set up and tear down the SUT for test execution
  • Design the appropriateTAAfor a given project
トピック 5
  • Explain the factors to be considered when identifyingreusability of components
  • Interpret both test data and test cases and transform them into executable scripts
トピック 6
  • Defining test scripts for the execution of the test case
  • Set up and tear down test suites

 

ISTQB Certified Tester Advanced Level, Test Automation Engineering認証サンプル問題と練習試験:https://www.passtest.jp/ISQI/CTAL-TAE-shiken.html

         

Related Links: myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt

コメントを残す

メールアドレスが公開されることはありません。 ※ が付いている欄は必須項目です

Enter the text from the image below