無料HCSA-Field-Transmission H35-260究極の学習ガイド(更新された333問あります) [Q100-Q117]

4/5 - (1 vote)

無料HCSA-Field-Transmission H35-260究極の学習ガイド(更新された333問あります)

トップクラスのH35-260練習試験問題

質問100、 When creating a PTN tunnel, you can set the priority of the tunnel. There are 0, 1, and 7. The larger the value, the higher the priority.

 
 

質問101、 Which of the following descriptions about routing loops is wrong?

 
 
 
 

質問102、 Which of the following descriptions about the use of detection packets in the PTN LTE scheme BFD is correct?

 
 
 
 

質問103、 What options are included in the role of the control word in PWE3?

 
 
 
 

質問104、 PTN’s ACR time sodium and 1588 clock can achieve time synchronization.

 
 

質問105、 Which of the following paths can be configured on the network management?

 
 
 
 

質問106、 The base station is deployed, the Tunnel and PW tests are normal, and the base station management is normal, but the base station cannot access the core network normally.
What is the reason for the impossibility?

 
 
 
 

質問107、 In the PTN network, what are the parameters for measuring QOS?

 
 
 
 
 

質問108、 0TUK_LOF is a 0TUK layer alarm, which means the OTuk frame is lost, the FAS frame alignment is detected, and the alarm is reported when the frame is out of synchronization for 5ms. The alarmends after the frame synchronization state is restored for 5ms.

 
 

質問109、 opt Datacollector supports black box fault data collection of multiple products. Which of the following products is not supported?

 
 
 
 

質問110、 Through the northbound interface, the U2000 can flexibly connect with different third-party network management systems, providing physical storage and reporting data information for the upper-layer network.

 
 

質問111、 According to the IEEE 802JQ standard, where is the VLAN ID field on the Ethernet?

 
 
 
 

質問112、 Which of the following is incorrect about the job description of a hub?

 
 
 
 

質問113、 In the PTNLTE non-load sharing scheme, the main L3 configuration is used to configure the route tracking multi-hop BFD scheme to prevent loops. Which of the following configurations needs to be performed?

 
 
 
 

質問114、 Which of the following ways does the Inspector inspection tool support adding network elements?

 
 
 
 

質問115、 Which of the following bridges are used to forward data based on the MAC address and VLAN ID carried in the data?

 
 
 
 

質問116、 Which of the following statements is incorrect about the optical layer interfaces OTM-nm and OTM-nrm of OTN?

 
 
 
 

質問117、 PTN can support in-band DCN. At this time, the port needs to enable the DCN function. Therefore, in CES service, PTN setup cannot be managed by in-band DCN.

 
 

合格させるHuawei H35-260試験問題でテスト復刻エンジンとPDF:https://www.passtest.jp/Huawei/H35-260-shiken.html

         

Related Links: myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt

コメントを残す

メールアドレスが公開されることはありません。 ※ が付いている欄は必須項目です

Enter the text from the image below